| Typical Design Details |
|
2" Setback |
6" Setback |
| . |
|
|
|
|
|
|
| LondonBoulder Unit Descriptions - All Setbacks |
|
. |
|
. |
|
. |
| 1 to 1 Excavation Oversizing - Gravity Wall |
|
|
|
|
|
|
| 1 to 1 Excavation Oversizing - Reinforced Walls |
|
|
|
|
|
|
| 90-Degree Inside Corner With Geogrid |
|
|
|
|
|
|
| 90-Degree Inside Corners All Setbacks |
|
|
|
|
|
|
| 90-Degree Outside Corner With Geogrid |
|
|
|
|
|
|
| 90-Degree Outside Corners All Setbacks |
|
|
|
|
|
|
| Daylight Draintile Through Toe Slope |
|
|
|
|
|
|
| Daylight Draintile Through Wall |
|
|
|
|
|
|
| Drainage Swale Details |
|
|
|
|
|
|
| Draintile Cut Away Details |
|
. |
|
. |
|
. |
| Draintile Through Block Details |
|
. |
|
. |
|
. |
| Drop Structure In Reinforced Zone |
|
|
|
|
|
|
|
Extending Draintile Vertically Through Geogrid |
|
|
|
|
|
|
|
Fence Construction Behind Wall |
|
|
|
|
|
|
|
Fence Construction On Wall |
|
|
|
|
|
|
|
Geosynthetic Connection Detail |
|
|
|
|
|
|
|
Groundwater Draining Into Excavation Cut |
|
|
|
|
|
|
|
Guide Rail Construction Behind Wall |
|
|
|
|
|
|
|
Inside Curve With Geogrid |
|
|
|
|
|
|
|
Outside Curve With Geogrid |
|
|
|
|
|
|
|
Radius Layouts |
|
|
|
|
|
|
|
Shoreline & Channel Wall Construction |
|
|
|
|
|
|
|
Top Of Wall Step-Down And Capping Detail |
|
|
|
|
|
|
|
Typical Base Preparation |
|
|
|
|
|
|
|
Utilities In Reinforced Zone_ Parallel To Wall Face |
|
|
|
|
|
|
|
Utility Pipe Penetrating Wall Face |
|
|
|
|
|
|
| Vertical Expansion Joint Construction |
|
|
|
|
|
|
| Wall Abutting Existing Structure |
|
|
|
|
|
|
|
Wall Layout Detail |
|
|
|
|
|
|
| |
| Download All Design Detail PDFs (Zipped) |
|
| Download All Design Details DWG (Zipped) |
|