Home > Products > LondonPaver > Installation Guidelines

 

  

INSTALLATION GUIDELINES

London Pavers
Step 1:
Excavate unsuitable, unstable or unconsolidated subgrade material and compact the area which has been cleared. Backfill and level with class 5 gravel or recycled concrete suitable for base material of compacted base for light vehicular and pedestrian traffic, increasing to 12 in. for heavy vehicular and industrial use.

Step 2: Place bedding course of washed concrete and sand conforming to the grading requirements to an approx. depth of 1 to 1-1/2".

Step 3: Where required, cut pavers with a concrete saw to fit accurately, neatly and without damaged edges.

Step 4: Tamp pavers with a plate compactor uniformly level, true to grade and free of movement.

Step 5: Fill joints with sand.

  
Bullet Edgers
Step 1:
Dig a trench 4" wide and 1"-4" deep depending upon how far you would like the edger to stick out of the ground.

Step 2: Prepare trench by applying one inch of aggregate (sand, class 5 or recycle concrete) and compacting to a uniform level.

Step 3: Position Bullet Edgers end to end in the trench. Using a mallet, tamp units firmly into place. Level each unit side to side, end to end and with adjoining units.

 
INSTALLATION PATTERNS

  

Specifications and Engineering
Installation Guidelines
Project Gallery
Distributors

 


Runner

Basketweave

Herringbone
       

       

Herringbone 45°
 

Basketweave
 

Basketweave

Herringbone
       

       

Random

Running Bond

Basketweave 90°
       
       
       
 

Home | Products | Services | About Us | Contact Us