|

INSTALLATION GUIDELINES
London Pavers
Step 1: Excavate unsuitable, unstable or unconsolidated subgrade
material and compact the area which has been cleared. Backfill and level
with class 5 gravel or recycled concrete suitable for base material of
compacted base for light vehicular and pedestrian traffic, increasing to
12 in. for heavy vehicular and industrial use.
Step 2: Place bedding course of
washed concrete and sand conforming to the grading requirements to an
approx. depth of 1 to 1-1/2".
Step 3: Where required, cut pavers
with a concrete saw to fit accurately, neatly and without damaged edges.
Step 4: Tamp pavers with a plate
compactor uniformly level, true to grade and free of movement.
Step 5: Fill joints with sand.
Bullet Edgers
Step 1: Dig a trench 4" wide and 1"-4" deep depending upon how far
you would like the edger to stick out of the ground.
Step 2: Prepare trench by applying
one inch of aggregate (sand, class 5 or recycle concrete) and compacting
to a uniform level.
Step 3: Position Bullet Edgers end to
end in the trench. Using a mallet, tamp units firmly into place. Level
each unit side to side, end to end and with adjoining units.
INSTALLATION PATTERNS |